water dept.
Village Water Department
Lucas enjoys high-quality water sourced from two underground wells. This water is pumped into storage facilities, including a 75,000-gallon detention tank and a 125,000-gallon water tank. The village’s water treatment and distribution system features 6.05 miles of piping and has a capacity exceeding 200,000 gallons per day, with current average daily usage around 70,986 gallons.
Rates
- Jan 2017 = .00788
- Jan 2018= .00796
- Jan 2019 = .00804
- Jan 2020 = .00812
- Jan 2021 = .00820
- Jan 2022 = .00828
- 0 – 2500 gallons – $25.00
- 2500 – 5000 gallons – 50.00
- 5000 – 7500 gallons – 75.00
- 7500 – 10000 gallons – 100.00
- 10000 – 15000 gallons – 150.00
- An additional charge of $25.00 per 2,500 gallons for any amount over 15,000 gallons.
Lead Service Line Replacement Inventory
Water systems must track addresses of all service lines in their internal inventory. For the publicly accessible version, location identifiers are required for lead and galvanized requiring replacement. If the system does not use addresses for their location identifier, other options could include GPS coordinates, landmark, intersection, block, or other details to specify service line locations. Click the button below to review the current status of the water lines at your property.

